{
  "slug": "sd511-restriction-12908200",
  "url": "https://605buzz.com/articles/sd511-restriction-12908200",
  "title": "Restrictions: miscellaneous construction listed on I-90 from Oct. 26, 2026",
  "dek": "The South Dakota Department of Transportation lists Restrictions: miscellaneous construction at I-90 from 0.25 mile west of Junction South Dakota 240-Wall-Exit 110 to 0.50 mile west of Junction US 14-Wall-Exit 112, with a listed start of Oct. 26, 2026.",
  "vertical": "public-safety",
  "publishedAt": "2026-10-24T12:04:06.310Z",
  "updatedAt": null,
  "provenance": {
    "sourceUrl": "https://www.sd511.org/",
    "noticeReceivedDate": "2026-10-26",
    "contentHash": "bdce4777c95c8f30034a9628192d4ef98bd06c93c1388c330469910b8ebe24dd",
    "editorialTier": "tier1-auto-publish",
    "provenanceEnum": "template-assembled",
    "correctionCount": 0,
    "humanReviewed": false,
    "derivedFacts": null
  },
  "bodyMd": "**Restrictions: miscellaneous construction** is listed at I-90 from 0.25 mile west of Junction South Dakota 240-Wall-Exit 110 to 0.50 mile west of Junction US 14-Wall-Exit 112, according to the South Dakota Department of Transportation's traveller-information feed.\n\nThe feed gives the route as I-90, the reference milepost as 111.757 and the affected direction as Both Directions.\n\nThe feed publishes a listed start of Oct. 26, 2026, 6 a.m. MDT / 7 a.m. CDT and a listed end of Oct. 30, 2026, 4 p.m. MDT / 5 p.m. CDT. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.\n\nWhether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.\n\nThe feed publishes coordinates of 43.98833079, -102.2366171 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.\n\nThe department's own description of the work, reproduced without changes as published in the feed:\n\n> Restrictions in the future include: from 6:00 AM MDT Monday, October 26, 2026 width limit 16 ft until 4:00 PM MDT Friday, October 30, 2026.\n\nThat paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.\n\n605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check [SD511](https://www.sd511.org/) before travelling.",
  "corrections": {
    "versionCount": 1,
    "correctionCount": 0,
    "ledgerUrl": "https://605buzz.com/corrections"
  }
}