{
  "slug": "sd511-road-work-12902748",
  "url": "https://605buzz.com/articles/sd511-road-work-12902748",
  "title": "Road work: bridge repair listed on US-281 from April 21, 2026",
  "dek": "The South Dakota Department of Transportation lists Road work: bridge repair at US-281 from 9.50 miles south to 6 miles south of Junction US 12-Aberdeen, with a listed start of April 21, 2026. Whether it is currently underway is shown on the page, computed from the listed dates when you load it.",
  "vertical": "public-safety",
  "publishedAt": "2026-08-05T00:32:21.695Z",
  "updatedAt": null,
  "provenance": {
    "sourceUrl": "https://www.sd511.org/",
    "noticeReceivedDate": "2026-04-21",
    "contentHash": "206ae2b8f0a32c00587fb499c87159c3074fb015f033f708d5abf6f8d971f2e5",
    "editorialTier": "tier1-auto-publish",
    "provenanceEnum": "ai-drafted",
    "correctionCount": 0,
    "humanReviewed": false
  },
  "bodyMd": "**Road work: bridge repair** is listed at US-281 from 9.50 miles south to 6 miles south of Junction US 12-Aberdeen, according to the South Dakota Department of Transportation's traveller-information feed.\n\nThe feed gives the route as US-281, the reference milepost as 187.152 and the affected direction as Both Directions.\n\nThe feed publishes a listed start of 2026-04-21T18:47:00.000Z and a listed end of 2026-10-16T22:00:00.000Z. Times are given in UTC as converted from the feed's own numeric timestamps.\n\nWhether this work is currently underway is not stated in this text, deliberately: it depends on the time you are reading, so 605Buzz computes it from the dates above each time the page is loaded rather than storing an answer that would go out of date without anyone noticing. The status shown at the top of this page is the computed one.\n\nThe feed publishes coordinates of 45.35512645, -98.5153673 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.\n\nThe department's own description of the work, reproduced without changes as published in the feed:\n\n> The following road construction project is in progress: bridge repair with delays 5 minutes, lanes reduced to 1, no passing, speed limit 35 mph, traffic routed to opposing lanes, truck speed limit 35 mph, and width limit 12 ft daily between 6:00 AM and 7:00 AM until 5:00 PM CDT Friday, October 16, 2026. For information or questions about a construction project, please find contact information for our SDDOT Area Offices at:\n\nThat paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it. 605Buzz does not rewrite it, and a detail inside it can be superseded without the surrounding fields changing.\n\nThe feed links [dot.sd.gov/inside-sddot/region-area-offices/region-area-offices](https://dot.sd.gov/inside-sddot/region-area-offices/region-area-offices) for this project.\n\n605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check [SD511](https://www.sd511.org/) before travelling.\n\nThis record comes from the South Dakota Department of Transportation's public traveller-information feed, served through its vendor's content network. Neither host publishes a robots.txt or terms-of-use page, so no access directive exists either way; 605Buzz reproduces the department's own fields with attribution and does not claim a licence nobody granted.\n\nSee the [corrections ledger](/corrections) if a field is wrong.",
  "corrections": {
    "versionCount": 1,
    "correctionCount": 0,
    "ledgerUrl": "https://605buzz.com/corrections"
  }
}