{
  "slug": "sd511-road-work-12904843",
  "url": "https://605buzz.com/articles/sd511-road-work-12904843",
  "title": "Road work: grading listed on I-90 from May 20, 2026",
  "dek": "The South Dakota Department of Transportation lists Road work: grading at I-90 from 1.50 miles east of Junction US 85 South-Exit 17 to 0.50 mile west of Junction South Dakota 34-Whitewood Exit 23, with a listed start of May 20, 2026. Whether it is currently underway is shown on the page, computed from the listed dates when you load it.",
  "vertical": "public-safety",
  "publishedAt": "2026-08-05T00:32:21.695Z",
  "updatedAt": null,
  "provenance": {
    "sourceUrl": "https://www.sd511.org/",
    "noticeReceivedDate": "2026-05-20",
    "contentHash": "b30d6cc62064d377a14305ec0ff9d7f457e6c14360de8897065e76a904fb291a",
    "editorialTier": "tier1-auto-publish",
    "provenanceEnum": "ai-drafted",
    "correctionCount": 0,
    "humanReviewed": false
  },
  "bodyMd": "**Road work: grading** is listed at I-90 from 1.50 miles east of Junction US 85 South-Exit 17 to 0.50 mile west of Junction South Dakota 34-Whitewood Exit 23, according to the South Dakota Department of Transportation's traveller-information feed.\n\nThe feed gives the route as I-90, the reference milepost as 21.107 and the affected direction as Both Directions.\n\nThe feed publishes a listed start of 2026-05-20T15:20:00.000Z and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Times are given in UTC as converted from the feed's own numeric timestamps.\n\nWhether this work is currently underway is not stated in this text, deliberately: it depends on the time you are reading, so 605Buzz computes it from the dates above each time the page is loaded rather than storing an answer that would go out of date without anyone noticing. The status shown at the top of this page is the computed one.\n\nThe feed publishes coordinates of 44.48229749, -103.68954451 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.\n\nThe department's own description of the work, reproduced without changes as published in the feed:\n\n> The following road construction project is in progress: grading in the ditch with width limit 16 ft until further notice. Slope Flattening, Guardrail Elimination and Box Culvert Extension\n\nThat paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it. 605Buzz does not rewrite it, and a detail inside it can be superseded without the surrounding fields changing.\n\nThe feed links [dot.sd.gov/inside-sddot/region-area-offices/region-and-area-offices/](https://dot.sd.gov/inside-sddot/region-area-offices/region-and-area-offices/) for this project.\n\n605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check [SD511](https://www.sd511.org/) before travelling.\n\nThis record comes from the South Dakota Department of Transportation's public traveller-information feed, served through its vendor's content network. Neither host publishes a robots.txt or terms-of-use page, so no access directive exists either way; 605Buzz reproduces the department's own fields with attribution and does not claim a licence nobody granted.\n\nSee the [corrections ledger](/corrections) if a field is wrong.",
  "corrections": {
    "versionCount": 1,
    "correctionCount": 0,
    "ledgerUrl": "https://605buzz.com/corrections"
  }
}