{
  "slug": "sd511-road-work-12905847",
  "url": "https://605buzz.com/articles/sd511-road-work-12905847",
  "title": "Road work: fresh oil listed on SD-20 from Sept. 2, 2026",
  "dek": "The South Dakota Department of Transportation lists Road work: fresh oil at SD-20 from Junction South Dakota 45 South to 10 miles west of Junction South Dakota 37 North-Conde, with a listed start of Sept. 2, 2026.",
  "vertical": "public-safety",
  "publishedAt": "2026-09-06T12:01:40.048Z",
  "updatedAt": "2026-09-07T12:03:20.670Z",
  "provenance": {
    "sourceUrl": "https://www.sd511.org/",
    "noticeReceivedDate": "2026-09-02",
    "contentHash": "1e1221ef187dcb4ec172cf7b662a52b43ff09d8c8fb95c1128357bd7f5d07751",
    "editorialTier": "tier1-auto-publish",
    "provenanceEnum": "template-assembled",
    "correctionCount": 1,
    "humanReviewed": false
  },
  "bodyMd": "**Road work: fresh oil** is listed at SD-20 from Junction South Dakota 45 South to 10 miles west of Junction South Dakota 37 North-Conde, according to the South Dakota Department of Transportation's traveller-information feed.\n\nThe feed gives the route as SD-20, the reference milepost as 310.555 and the affected direction as Both Directions.\n\nThe feed publishes a listed start of Sept. 2, 2026, 10:42 a.m. MDT / 11:42 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.\n\nWhether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.\n\nThe feed publishes coordinates of 45.15797684, -98.69042935 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.\n\nThe department's own description of the work, reproduced without changes as published in the feed:\n\n> The following road construction project is in progress: fresh oil with delays 15 minutes, flaggers, lanes reduced to 1, no passing, pilot car, speed limit 30 mph, traffic routed to opposing lanes, and truck speed limit 30 mph Monday through Friday between 6:00 AM and 6:00 PM until further notice. For information or questions about a construction project, please find contact information for our SDDOT Area Offices at:\n\nThat paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.\n\nThe feed links [dot.sd.gov/inside-sddot/region-area-offices/region-area-offices](https://dot.sd.gov/inside-sddot/region-area-offices/region-area-offices) for this project.\n\n605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check [SD511](https://www.sd511.org/) before travelling.",
  "corrections": {
    "versionCount": 2,
    "correctionCount": 1,
    "ledgerUrl": "https://605buzz.com/corrections"
  }
}