{
  "slug": "sd511-road-work-12905979",
  "url": "https://605buzz.com/articles/sd511-road-work-12905979",
  "title": "Road work: bridge repair listed on I-90 from Sept. 9, 2026",
  "dek": "The South Dakota Department of Transportation lists Road work: bridge repair at I-90 from 1.50 miles west to 0.50 mile east of Oacoma-Exit 260, with a listed start of Sept. 9, 2026.",
  "vertical": "public-safety",
  "publishedAt": "2026-09-09T12:01:04.152Z",
  "updatedAt": null,
  "provenance": {
    "sourceUrl": "https://www.sd511.org/",
    "noticeReceivedDate": "2026-09-09",
    "contentHash": "1c2443e25a8bc888cd8f19f277803ca8be854787b3a585046676822fe2096afb",
    "editorialTier": "tier1-auto-publish",
    "provenanceEnum": "template-assembled",
    "correctionCount": 0,
    "humanReviewed": false
  },
  "bodyMd": "**Road work: bridge repair** is listed at I-90 from 1.50 miles west to 0.50 mile east of Oacoma-Exit 260, according to the South Dakota Department of Transportation's traveller-information feed.\n\nThe feed gives the route as I-90, the reference milepost as 260.709 and the affected direction as Both Directions.\n\nThe feed publishes a listed start of Sept. 9, 2026, 8:30 a.m. MDT / 9:30 a.m. CDT and a listed end of Sept. 9, 2026, 1:30 p.m. MDT / 2:30 p.m. CDT. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.\n\nWhether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.\n\nThe feed publishes coordinates of 43.80157735, -99.40070842 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.\n\nThe department's own description of the work, reproduced without changes as published in the feed:\n\n> The following road construction project is scheduled to begin: from 1.50 miles west to 0.50 mile east of Oacoma-Exit 260 - from 9:30 AM CDT Wednesday, September 9, 2026 bridge repair on bridges until 2:30 PM CDT Wednesday, September 9, 2026. Mobile lane closures for bridge approach repair.\n\nThat paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.\n\n605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check [SD511](https://www.sd511.org/) before travelling.",
  "corrections": {
    "versionCount": 1,
    "correctionCount": 0,
    "ledgerUrl": "https://605buzz.com/corrections"
  }
}