{
  "slug": "sd511-road-work-12908001",
  "url": "https://605buzz.com/articles/sd511-road-work-12908001",
  "title": "Road work: pavement repair listed on SD-79 from Nov. 15, 2026",
  "dek": "The South Dakota Department of Transportation lists Road work: pavement repair at SD-79 from Junction US 18 and 385 east of Hot Springs to 0.25 mile north of Junction US 18 and 385 east of Hot Springs, with a listed start of Nov. 15, 2026.",
  "vertical": "public-safety",
  "publishedAt": "2026-11-15T12:01:26.320Z",
  "updatedAt": null,
  "provenance": {
    "sourceUrl": "https://www.sd511.org/",
    "noticeReceivedDate": "2026-11-15",
    "contentHash": "587e0ddccfc998f472d3fad53e7e555c7d06b0cc5f2ee6cd032b3c91bfe67daf",
    "editorialTier": "tier1-auto-publish",
    "correctionCount": 0,
    "humanReviewed": false
  },
  "bodyMd": "SD-79 near Hot Springs is scheduled for pavement repair in both directions.\n\nWork includes pavement repair in the driving lane with no passing, traffic routed to opposing lanes, and width limit 16 ft Monday through Saturday between 6 a.m. and 5 p.m. until further notice. For questions please call Custer Area DOT Office at 605-981-5089.\n\nThe listed work zone runs from Junction US 18 and 385 east of Hot Springs to a quarter mile north of Junction US 18 and 385 east of Hot Springs, near milepost 0. The work is listed from 6:51 p.m. MST (7:51 p.m. CST) Saturday, Nov. 14, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.\n\nPlans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at [SD511](https://www.sd511.org/).",
  "facts": {
    "dateReceived": "2026-11-15",
    "direction": "Both Directions",
    "headline": "Road work: pavement repair",
    "locationDescription": "SD-79 from Junction US 18 and 385 east of Hot Springs to 0.25 mile north of Junction US 18 and 385 east of Hot Springs",
    "milepost": "0.240",
    "publisher": "South Dakota Department of Transportation",
    "report": "The following road construction project is in progress: pavement repair in the driving lane with no passing, traffic routed to opposing lanes, and width limit 16 ft Monday through Saturday between 6:00 AM and 5:00 PM until further notice. For questions please call Custer Area DOT Office at 605-981-5089.",
    "route": "SD-79",
    "startPublished": "Nov. 14, 2026, 6:51 p.m. MST / 7:51 p.m. CST"
  },
  "record": {
    "sourceUrl": "https://www.sd511.org/",
    "publisher": "South Dakota Department of Transportation",
    "receivedDate": "2026-11-15"
  },
  "corrections": {
    "versionCount": 1,
    "correctionCount": 0,
    "ledgerUrl": "https://605buzz.com/corrections"
  }
}