public-safety
Restrictions: pavement repair listed on US-212 from Oct. 26, 2026
The South Dakota Department of Transportation lists Restrictions: pavement repair at US-212 from Faulkton to Junction South Dakota 45 South, with a listed start of Oct. 26, 2026.
Published automatically from public-record data — not yet reviewed by an editor. A language model shortens some articles by choosing whole sentences to delete; it cannot write, rephrase, reorder or add text. See /about. This article was not shortened: every word below is the template's.
Key facts
- What
- Public safety
- When
- Record date Oct. 26, 2026; Added Oct. 27, 2026
- Source
- Road work and restrictions
- Read time
- About 2 minutes
How this desk works (below the article)
Restrictions: pavement repair is listed at US-212 from Faulkton to Junction South Dakota 45 South, according to the South Dakota Department of Transportation's traveller-information feed.
The feed gives the route as US-212, the reference milepost as 275.290 and the affected direction as Both Directions.
The feed publishes a listed start of Oct. 26, 2026, 12:03 p.m. MDT / 1:03 p.m. CDT and a listed end of Nov. 6, 2026, 4 p.m. MST / 5 p.m. CST. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.
The feed publishes coordinates of 45.03376321, -99.02010161 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.
The department's own description of the work, reproduced without changes as published in the feed:
Restrictions include: width limit 12 ft daily between 6:00 AM and 6:00 PM until 5:00 PM CST Friday, November 6, 2026. For information or questions about a construction project, please find contact information for our SDDOT Area Offices at:
That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.
The feed links dot.sd.gov/inside-sddot/region-area-offices/region-area-offices for this project.
605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check SD511 before travelling.