Skip to main content

public-safety

Road work: miscellaneous construction listed on US-81 from Aug. 5, 2026

The South Dakota Department of Transportation lists Road work: miscellaneous construction at US-81 from 1 mile north of Junction South Dakota 50 West to 5.75 miles south of Junction South Dakota 46, with a listed start of Aug. 5, 2026. Whether it is currently underway is shown on the page, computed from the listed dates when you load it.

605Buzz automated newsroom, from public records Added

Published automatically from public-record data — not yet reviewed by an editor.

Road work: miscellaneous construction is listed at US-81 from 1 mile north of Junction South Dakota 50 West to 5.75 miles south of Junction South Dakota 46, according to the South Dakota Department of Transportation's traveller-information feed.

The feed gives the route as US-81, the reference milepost as 6.662 and the affected direction as Both Directions.

The feed publishes a listed start of 2026-08-05T11:09:00.000Z and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Times are given in UTC as converted from the feed's own numeric timestamps.

Whether this work is currently underway is not stated in this text, deliberately: it depends on the time you are reading, so 605Buzz computes it from the dates above each time the page is loaded rather than storing an answer that would go out of date without anyone noticing. The status shown at the top of this page is the computed one.

The feed publishes coordinates of 42.952253, -97.397907 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.

The department's own description of the work, reproduced without changes as published in the feed:

The following road construction project is in progress: miscellaneous construction adjacent to the roadway until further notice. Asphalt Surface Treatment (Chip Seal) will be placed on the northern mainline portion of this route beginning the week of August 17th. Roadway conditions will include Fresh Oil & Loose Rock. Traffic will be maintained with Flaggers and a Pilot Car.

An asphalt fog seal will be placed on the asphalt shoulders adjacent to the concrete with the use of lane closures.

New pavement markings will also be placed with the project.

Currently the Contractor is placing traffic control signs.

That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it. 605Buzz does not rewrite it, and a detail inside it can be superseded without the surrounding fields changing.

The feed links dot.sd.gov/projects-studies/construction-info for this project.

605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check SD511 before travelling.

This record comes from the South Dakota Department of Transportation's public traveller-information feed, served through its vendor's content network. Neither host publishes a robots.txt or terms-of-use page, so no access directive exists either way; 605Buzz reproduces the department's own fields with attribution and does not claim a licence nobody granted.

See the corrections ledger if a field is wrong.