public-safety
Road work: fresh oil, loose rock listed on SD-28 from Aug. 10, 2026
The South Dakota Department of Transportation lists Road work: fresh oil, loose rock at SD-28 from 3 miles west of Carpenter to Junction South Dakota 25 North, with a listed start of Aug. 10, 2026.
Published automatically from public-record data — not yet reviewed by an editor. A language model shortens some articles by choosing whole sentences to delete; it cannot write, rephrase, reorder or add text, so every word is the template's. A person approves each one. See /about.
Road work: fresh oil, loose rock is listed at SD-28 from 3 miles west of Carpenter to Junction South Dakota 25 North, according to the South Dakota Department of Transportation's traveller-information feed.
The feed gives the route as SD-28, the reference milepost as 36.936 and the affected direction as Both Directions.
The feed publishes a listed start of Aug. 10, 2026, 6 a.m. MDT / 7 a.m. CDT and a listed end of Aug. 21, 2026, 5 p.m. MDT / 6 p.m. CDT. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.
The feed publishes coordinates of 44.63112767, -97.73434946 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.
The department's own description of the work, reproduced without changes as published in the feed:
The following road construction project is in progress: fresh oil and loose rock with flaggers, pilot car, speed limit 45 mph, and truck speed limit 45 mph until 6:00 PM CDT Friday, August 21, 2026. Chip Seal Surface Treatment - Pavement Preservation
That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.
605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check SD511 before travelling.