public-safety
Road work: paving listed on SD-10 from Sept. 14, 2026
The South Dakota Department of Transportation lists Road work: paving at SD-10 from 9.75 miles east of Junction US 281 North to Junction South Dakota 27 South-Britton, with a listed start of Sept. 14, 2026.
Published automatically from public-record data — not yet reviewed by an editor. A language model shortens some articles by choosing whole sentences to delete; it cannot write, rephrase, reorder or add text, so every word is the template's. A person approves each one. See /about.
Road work: paving is listed at SD-10 from 9.75 miles east of Junction US 281 North to Junction South Dakota 27 South-Britton, according to the South Dakota Department of Transportation's traveller-information feed.
The feed gives the route as SD-10, the reference milepost as 124.734 and the affected direction as Both Directions.
The feed publishes a listed start of Sept. 14, 2026, 7:55 a.m. MDT / 8:55 a.m. CDT and a listed end of Oct. 30, 2026, 8 a.m. MDT / 9 a.m. CDT. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.
The feed publishes coordinates of 45.79179288, -98.06328411 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.
The department's own description of the work, reproduced without changes as published in the feed:
The following road construction project is in progress: paving with delays 15 minutes, flaggers, lanes reduced to 1, no passing, pilot car, speed limit 30 mph, traffic routed to opposing lanes, and truck speed limit 30 mph Monday through Saturday between 6:00 AM and 6:00 PM until 9:00 AM CDT Friday, October 30, 2026. For information or questions about a construction project, please find contact information for our SDDOT Area Offices at:
That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.
The feed links dot.sd.gov/inside-sddot/region-area-offices/region-area-offices for this project.
605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check SD511 before travelling.