Road work: bridge construction, grading listed on I-29 from Sept. 23, 2026
The South Dakota Department of Transportation lists Road work: bridge construction, grading at I-29 from 1.50 miles south of Junction Interstate 229-Sioux Falls-Exit 75 to Junction Interstate 229-Sioux Falls-Exit 75, with a listed start of Sept. 23, 2026.
605Buzz Added Record date
Published automatically from public-record data — not yet reviewed by an editor.
I-29 near Sioux Falls is scheduled for bridge construction and grading in both directions.
Work includes bridge construction adjacent to the roadway and grading adjacent to the roadway until further notice. Construction of New 85th St & I29 Interchange. Current shoulder closures along I29 SB and I29 NB. Additional lane closure along the I229 SB to I29 SB ramp for construction of new bridge and construction traffic.
The listed work zone runs from a mile and a half south of the Interstate 229 junction at Sioux Falls (Exit 75) to the Interstate 229 junction at Sioux Falls (Exit 75), near milepost 75. The work is listed from 6:12 a.m. MDT (7:12 a.m. CDT) Wednesday, Sept. 23, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.
Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at SD511.
Around this record
The records published so far include 10 road records from the South Dakota Department of Transportation within about 16 miles of this location with a listed start on or before this date. SDDOT published no end date for all of them, which is how the department represents work scheduled until further notice — whether those are current cannot be worked out from the records, and no guess is made. SD511 is the department's own live conditions service.
The records published so far include 1 other record within 5.0 miles of this location whose own record date is also this date. That counts only the published records, not everything happening nearby, and a record's date means different things by desk — a permit's is the day it was issued, an event's is the day it happens.
This section is assembled from other records already published and from arithmetic on the date above and on the coordinate this record's source published. It is not part of the filed record.
Email me when this record changes
These records are re-read on a schedule. Pick something this record
states, and you'll hear when it is corrected or the filing behind it
is amended — and when any other published record states that same
value under that same field, whichever body published it.
Alert email is not switched on yet. Picking one of these below saves it as pending; when sending starts you'll get one message asking you to confirm it, and nothing at all until you answer that. You can follow a road, a town, a permit number
or an employer — never a person's name or a street address.
What following means
·
Privacy notice