public-safety
Road work: miscellaneous construction listed on US-14 from Oct. 28, 2026
The South Dakota Department of Transportation lists Road work: miscellaneous construction at US-14 from 0.25 mile west to 0.25 mile east of Junction South Dakota 1889-Pierre, with a listed start of Oct. 28, 2026.
Published automatically from public-record data — not yet reviewed by an editor. A language model shortens some articles by choosing whole sentences to delete; it cannot write, rephrase, reorder or add text. See /about. This article was not shortened: every word below is the template's.
Key facts
- What
- Public safety
- When
- Record date Oct. 28, 2026; Added Oct. 27, 2026
- Source
- Road work and restrictions
- Read time
- About 2 minutes
How this desk works (below the article)
Road work: miscellaneous construction is listed at US-14 from 0.25 mile west to 0.25 mile east of Junction South Dakota 1889-Pierre, according to the South Dakota Department of Transportation's traveller-information feed.
The feed gives the route as US-14, the reference milepost as 115.990 and the affected direction as Both Directions.
The feed publishes a listed start of Oct. 28, 2026, 2 a.m. MDT / 3 a.m. CDT and a listed end of Oct. 28, 2026, 3:30 a.m. MDT / 4:30 a.m. CDT. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.
The feed publishes coordinates of 44.36677995, -100.35376012 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.
The department's own description of the work, reproduced without changes as published in the feed:
The following road construction project is scheduled to begin: from 3:00 AM CDT Wednesday, October 28, 2026 ROAD CLOSED and miscellaneous construction until 4:30 AM CDT Wednesday, October 28, 2026. Travel on US14 in Pierre will be disrupted between 3:00 am and 4:30 am on Wednesday, October 28 for removal of a large sign bridge. The highway will be completely closed part of the time. Truck traffic should detour using SD1804, SD204, and SD1806 around Oahe Dam.
That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.
605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check SD511 before travelling.