Corrections record
Public safety / First published
Road work: loose rock, paving, uneven lanes listed on SD-11 from Sept. 28, 2026
Published automatically from public-record data. Whether a person reviewed any later version is recorded against that version below. This heading is the article's current headline.
Article identifier: sd511-road-work-12906856
Version history
Every published version of this article, newest first. Versions are append-only: a correction adds a row, it never rewrites history. Each version below states what changed against the version before it — which fields moved, and which body lines were added or removed.
The content hash is a SHA-256 fingerprint of that version's stored headline and body, computed when the version was written. Two versions with the same hash hold identical text; a changed hash proves the text moved. It is the tamper-evidence check — recompute it against an exported copy of a version and any silent edit shows up as a mismatch.
How we verify a hash — and how you can
Canonicalization: the hashed bytes are the version's stored headline, then the two characters ||, then the version's stored body markdown — UTF-8, SHA-256, lowercase hex. Nothing else is in the input: no normalization, re-wrapping or rendering is applied first, no trailing newline is added, and no other field (including the parent version's id) is mixed in.
Export a version's stored headline and body, join them with the two characters ||, and take the SHA-256 of the UTF-8 bytes. It must equal the hash printed beside that version. In a shell:
printf '%s' "HEADLINE||BODY" | shasum -a 256 -
Version 2
Source update — the underlying public record changed
Update from the source feed — no human edit
The headline and the body text both changed. (compared against version 1)
Headline at this version: Road work: loose rock, paving, uneven lanes listed on SD-11 from Sept. 28, 2026
Removed (13 lines )
- **Road work: loose rock, paving, uneven lanes** is listed at SD-11 from 11 miles north of Junction South Dakota 48 to 15 miles south of Junction US 18 East-Canton, according to the South Dakota Department of Transportation's traveller-information feed.
- The feed gives the route as SD-11, the reference milepost as 18.630 and the affected direction as Both Directions.
- The feed publishes a listed start of Sept. 18, 2026, 8:51 a.m. MDT / 9:51 a.m. CDT and no listed end — the feed publishes none for this record, which is how it represents work scheduled until further notice. Each is one instant shown in both of South Dakota's zones — Mountain first, Central second; they are the same moment. The feed names a route and not a zone, so 605Buzz does not pick one for you.
- Whether this work is currently underway is not stated in this text: it depends on the time you are reading, and the department is the authority.
- The feed publishes coordinates of 43.02478179, -96.62814061 for this record. Those are the department's own figures, reproduced as published; 605Buzz does not geocode.
- The department's own description of the work, reproduced without changes as published in the feed:
- That paragraph is the department's wording at the time this record was last read, including any dates or restrictions inside it.
- The feed links [dot.sd.gov/hwy46-beresford-pcn-04jf](https://dot.sd.gov/hwy46-beresford-pcn-04jf) for this project.
- 605Buzz has not independently verified conditions on this road. Schedules change with weather and contractor progress, and the department is the authority; check [SD511](https://www.sd511.org/) before travelling.
Added (5 lines)
- SD-11 near Canton is scheduled for loose rock, paving and uneven lanes in both directions.
- The state transportation department describes the work this way:
- The listed work zone runs from 11 miles north of Junction South Dakota 48 to 15 miles south of Junction US 18 East-Canton, near milepost 19. The work is listed from 12:17 p.m. Mountain time (1:17 p.m. Central) Monday, Sept. 28, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.
- The project has its own page: [dot.sd.gov/hwy46-beresford-pcn-04jf](https://dot.sd.gov/hwy46-beresford-pcn-04jf).
- Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at [SD511](https://www.sd511.org/).
Content hash:
056e4087a004ff86609ab2b00c3689f8f3cbd1217fb8ade600aee0b1441ceaf5 -
Version 1
Initial publication
Initial publication — no human byline
No earlier version is in this record, so there is nothing to compare against.
Content hash:
7c27b04c0603ca1d8927d965e34b0c8b632b6540e01d6566a70dc08df512a39e
1 correction has been issued.
See something wrong? Read the corrections policy or write to corrections@605buzz.com — though mail to 605buzz.com is not routed yet, so that address currently bounces.