Skip to main content

public-safety

Road work: pavement repair listed on I-29 from Nov. 12, 2026

The South Dakota Department of Transportation lists Road work: pavement repair at I-29 N at RAMP I-29N TO 26 ST EXIT 78, with a listed start of Nov. 12, 2026.

605Buzz Added Record date

Published automatically from public-record data — not yet reviewed by an editor.

Key facts

What
Public safety
When
Record date Nov. 12, 2026; Added Nov. 13, 2026
Source
Road work and restrictions
Read time
About 1 minute

How this desk works (below the article)

Northbound I-29 is scheduled for pavement repair.

Work includes a road closure and pavement repair northbound until further notice. Concrete repairs planned for November 17 to November 20. Exit will be closed for this duration. Travelers are advised to take an alternative route.

The listed work zone is at I-29 N at RAMP I-29N TO 26 ST EXIT 78, near milepost 78. The work is listed from 12:44 p.m. MST (1:44 p.m. CST) Thursday, Nov. 12, 2026, with no end date, which is how work scheduled until further notice is listed. The listing does not say which time zone applies, so both are given.

Plans change with weather and crews' progress; the South Dakota Department of Transportation has the latest at SD511.

See something wrong? How corrections work — every correction ships with a diff + timestamp.

How this desk works

Where this comes from

This listing comes from the South Dakota Department of Transportation's public traveller information, served through its vendor's content network. Neither host publishes a robots.txt or terms-of-use page, so no access directive exists either way; the department's own fields are reproduced with attribution, and no licence is claimed that nobody granted.

How the times are shown

The department publishes start and end as numeric timestamps, so each is shown as a clock reading in both of South Dakota's zones.

How the status is decided

Whether work is currently underway is not written into the article text, deliberately: it depends on when you are reading. It is worked out from the listed dates each time the page loads rather than stored as an answer that would go out of date without anyone noticing. The status at the top of the page is that calculation, not a claim the department made.

The department's description is put into plain words by fixed rules only: its standard opening line is replaced, times and dates are written the way people say them, and direction words lose their capitals mid-sentence. Nothing is added, and every number, place and time it gives is kept; a description in a shape those rules were not written for is quoted exactly as published. A detail inside it can be superseded without the surrounding fields changing.

Around this record

The records published so far include 19 road records from the South Dakota Department of Transportation within about 16 miles of this location with a listed start on or before this date. SDDOT published no end date for all of them, which is how the department represents work scheduled until further notice — whether those are current cannot be worked out from the records, and no guess is made. SD511 is the department's own live conditions service.

The records published so far include 2 other records within 5.0 miles of this location whose own record date is also this date. That counts only the published records, not everything happening nearby, and a record's date means different things by desk — a permit's is the day it was issued, an event's is the day it happens.

This section is assembled from other records already published and from arithmetic on the date above and on the coordinate this record's source published. It is not part of the filed record.

Email me when this record changes

These records are re-read on a schedule. Pick something this record states, and you'll hear when it is corrected or the filing behind it is amended — and when any other published record states that same value under that same field, whichever body published it.

What would you like to follow?

Alert email is not switched on yet. Picking one of these below saves it as pending; when sending starts you'll get one message asking you to confirm it, and nothing at all until you answer that. You can follow a road, a town, a permit number or an employer — never a person's name or a street address. What following means · Privacy notice

Search every article ever published.